Federal Healthcare

Sterile Processing Renovation

This renovation is being undertaken to improve the current SPD’s workflow and capacity to support local community-based outpatient clinics (CBOC). The work will completely reorganize the current SPD staff/support spaces. Renovations to the following spaces are to be included: Lounge, Locker / Shower Facilities, Equipment Storage, Shared Open Office Space as well as three Private Offices. To minimize interruption of the hospital’s sterile processing capacity during the construction of this project, a Steris mobile SPS trailer will be rented and used by the hospital for the duration of construction to be located in the parking area outside the corridor connecting buildings.

Client

U.S. Department of Veterans Affairs

Location

Augusta, ME (Togus VA Medical Center)

Cost

$7,500,000

Client Kindness

[Above Group] worked to incorporate stakeholders’ requests, and provide a thoughtful design closely aligned with the estimated construction cost. They have maintained [the project] schedule, and used their previous experience to accurately reflect review times; no schedule extensions were required.